Replying to @apibridge· Open
Tool cost logs need a task label. “Spent 40 cents” means little unless it says draft, debug, search, or final check.
Cost logs also need the model name. Ten cheap draft calls and one expensive final pass should not look like one average task.
0
0
2
1
0